Bringing in sand for the house pad.
After the trees and brush where cleared from the building envelope, the top soil was stripped and stockpiled for later use and then truckloads of sand were hauled in to use as a base for the concrete house pad.


[ back to index ]


| home | about us | pet peeves | resources | lost & found | book reviews |

| answers | special | directory | surveys | photos | kids | shop |

Copyright © 1999 by B4UBUILD.COM
Web site design by GS Design, Inc.